Wesley Chapel Roadway Connection Study
Pasco County has posted a 450-page traffic study regarding the connection of Wesley Chapel roadways to those in New Tampa. To view the...
Pasco County has posted a 450-page traffic study regarding the connection of Wesley Chapel roadways to those in New Tampa.
To view the study, click here: http://www.pascocountyfl.net/DocumentCenter/View/42169/Wesley-Chapel-Roadway-Connection-Study-Draft-Report
The study has to do with several connections being considered between KBar Ranch, Meadow Pointe, and the widening of Bruce B Downs, and other future connection points.
To view our previous story on the same topic, check out these:
Could legal action force a connection Pasco and Hillsborough (Kinnan Rd to Mansfield Blvd)?
Group of Meadow Pointe Residents Oppose 7/11 being built in Meadow Pointe Community
New Roadways planned to connect Wesley Chapel and New Tampa
Pasco County MPO will provide a brief introduction, followed by a condensed version of the report that hits on the major points, and public comment session on Tuesday, May 29, from 6-8 p.m. at at Pasco-Hernando State College, Room B-303 (Wesley Chapel Campus).

Continue this story for free.
Stay informed about Wesley Chapel. Enter your email to access the full story and receive local news and community updates.
Free to read · No password to remember
New here? We’ll email you a sign-in link and code. Already a reader? Use your usual email.
Read next

Pasco Plans a Medical Magnet High School in Wesley Chapel to Open by 2028
Pasco County is planning a health care–focused magnet high school in Wesley Chapel, a roughly $80 million campus targeted to open by August 2028 and built to relieve two of the area's most overcrowded high schools.
Read the story ↗




Comments
How does this affect your family or local school? Share your experience.
Your draft stays here while you sign in. Be respectful and keep it local.
No comments yet. Be the first to share your thoughts!